Question # 17

Which of the following installations would require a structural engineer to be involved?

A.

A wall-mounted furniture workstation

B.

A demountable partition wall

C.

A non-load-bearing interior wall

D.

An operable partition wall

Full Access
Question # 18

What is the MOST effective construction method to help mitigate impact noise from high heels on ahard floor surface?

A.

Higher NRC in the ceiling material

B.

Framed-in upholstered wall panel system

C.

Resilient underlayment in the floor assembly

D.

Blanket insulation between joists and trusses

Full Access
Question # 19

After completion of a project, the client spills coffee on their new lobby sofa. Where would the client look for information on how to remove the stain?

A.

product data sheet

B.

warranty information

C.

maintenance manual

D.

furniture specification

Full Access
Question # 20

What kind of schedule shows which tasks are the highest priority and what the effect will be on the overall project if the tasks take longer than estimated?

A.

Work Flow

B.

Gantt Chart

C.

Critical Path Method (CPM)

D.

Program Evaluation Review Technique (PERT)

Full Access
Question # 21

Legislation that establishes guidelines of professional responsibilities for an interior designer is known as the

A.

title act

B.

practice act

C.

registration act

D.

professional act

Full Access
Question # 22

A designer who is working on a non-profit community center in a historic building has met individually with the project’s benefactor, the community center’s board, the center’s director and staff, local community members, the municipality’s historic preservation committee, and the retained contractor. Which of the following is the designer’s GREATEST challenge?

A.

Balancing the various stakeholders’ preferences

B.

Working with the contractor towards a unique design

C.

Balancing material and finishes that have historical significance

D.

Working with the community towards a concept that will use the space as desired

Full Access
Question # 23

Design time has exceeded what was estimated when determining the fixed-fee contract. Whatshould be done?

A.

Proceed with fees designated in the contract

B.

Negotiate a new contract and fee agreement

C.

Stop work until a new agreement can be negotiated

D.

Attach time sheets to the invoice to clarify additional fees

Full Access
Question # 24

With regard to electrical systems, one responsibility of an interior designer is to provide the

A.

Quantity of junction boxes for light fixtures

B.

Quantity of conduit for wiring under carpet

C.

Location of electrical panel and circuit breakers

D.

Location of power required for built-in equipment

Full Access