Winter Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: v4s65

LEED-AP-O+M Exam Dumps - LEED AP Operations + Maintenance (LEED AP O+M)

Go to page:
Question # 17

Under what scenario must building visitors be surveyed for the Location and Transportation Credit, Alternative Transportation, Option 1?

A.

When the number of visitors reaches 10% the number of regular building occupants

B.

During the transportation survey period all visitors need to be invited to participate in the survey

C.

Every day no matter the number of visitors in relation to the number of regular building occupants

D.

When either the typical peak or daily average is greater than the number of regular building occupants

Full Access
Question # 18

A building is certified in LEED EB v2.0. Upon recertification, which LEED Operations and Maintenance version should be used?

A.

LEED EB v2.0

B.

Whichever version the team designates

C.

The version that is current at the time of registration for recertification

D.

The version subsequent to the version under which the project initially certified

Full Access
Question # 19

Which of the following strategies will qualify for an exemplary performance point under Innovation Credit, Innovation, Option 3. Additional Strategies?

A.

Meet at least 10% of total energy with on-site renewable energy

B.

Reduce outdoor water use by 60%

C.

Document an alternative transport

D.

Obtain a response rate for the occupant comfort survey of 100%

Full Access
Question # 20

Buildings account for what percentage of total energy use?

A.

30%

B.

40%

C.

50%

D.

60%

Full Access
Question # 21

An individual tenant in a multi-tenant building is unwilling or unable to provide their purchasing data. How does this affect the overall requirement for Materials and Resources Credit, Purchasing - Ongoing?

A.

The building is not eligible for this credit

B.

The total purchases would be decreased by the tenant's pro rata square footage

C.

The tenant's purchasing is assumed to be 50% compliant toward the sustainability criteria

D.

If the tenant's space is less than 10% of the total building, their total purchases can be excluded

Full Access
Question # 22

Which of the following options about project boundaries is correct?

A.

The LEED project boundary may not include other buildings

B.

A LEED campus boundary for the master site is not necessary to pursue with LEED campus certification

C.

The gross floor area of the LEED project should be no less than 2% of the gross land area within the LEED project boundary

D.

Sites with a master plan for multiple buildings and/or phased development must not designate a LEED project boundary for each individual project

Full Access
Question # 23

Which of the following is an environmentally friendly technology for controlling erosion?

A.

Mulching

B.

Laying asphalt

C.

Laying tarpaulin material

D.

Spraying water to contain dust

Full Access
Question # 24

Which refrigerant was phased out due to the Montreal Protocol?

A.

CFC-11

B.

HCFC-22

C.

HFC-134a

D.

HCFC-123

Full Access
Go to page: