What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
What is the minimum percentage reduction from the baseline required to earn the exemplary performance point for the Indoor Water Use Reduction Credit, Option 2?
What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?
When a building owner is deciding whether to execute an ASHRAE Level 2 audit or commissioning for Energy and Atmosphere Credit, Existing Building Commissioning -Analysis, which of the following statements most appropriately explains the difference between an ASHRAE Level 2 audit and commissioning of an existing building?
What is the intent of Indoor Environmental Quality Credit, Daylight and Quality Views?
Which of the following topics is unnecessary in order to comply with the Sustainable Sites Credit, Site Improvement
Plan?
The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is