Question # 25

What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

A.

10% of the vacant space

B.

10% of the gross floor area

C.

10% of the project site area

D.

10% of the regularly occupied area

Full Access
Question # 26

What is the minimum percentage reduction from the baseline required to earn the exemplary performance point for the Indoor Water Use Reduction Credit, Option 2?

A.

20%

B.

25%

C.

30%

D.

35%

Full Access
Question # 27

What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

A.

Compile meter data into daily and weekly summaries

B.

Use Labs21 Energy Benchmarking tool to calculate minimum energy performance

C.

Establish an ENERGY STAR® Portfolio Manager profile

D.

Benchmark building site energy data of at least three similar buildings

Full Access
Question # 28

Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?

A.

Residential dishwashers and coffee makers

B.

Residential clothes washers and dishwashers

C.

Residential dishwashers and drinking fountains

D.

Residential clothes washers and vending machines

Full Access
Question # 29

When a building owner is deciding whether to execute an ASHRAE Level 2 audit or commissioning for Energy and Atmosphere Credit, Existing Building Commissioning -Analysis, which of the following statements most appropriately explains the difference between an ASHRAE Level 2 audit and commissioning of an existing building?

A.

An ASHRAE Level 2 audit is required for newer buildings while commissioning is required for buildings in operation for more than five years

B.

An ASHRAE Level 2 audit requires development of an energy use breakdown based on sub-metering while commissioning requires development of an energy use breakdown based on energy modeling

C.

An ASHRAE Level 2 audit involves testing the operation of the systems against the sequences of operation while commissioning involves determining that the system operation meets the owner's current facility requirements

D.

An ASHRAE Level 2 audit focuses on finding major upgrades to the building envelope or me-chanical, electrical, or controls systems while commissioning focuses on controls, proper sys-tem operations, and efficiency improvements

Full Access
Question # 30

What is the intent of Indoor Environmental Quality Credit, Daylight and Quality Views?

A.

To achieve a daylight factor in all spaces

B.

To provide lighting controls for regularly occupied spaces

C.

To achieve direct line of site to vision glazing for all building occupants

D.

To provide a connection between building occupants and the outdoor environment

Full Access
Question # 31

Which of the following topics is unnecessary in order to comply with the Sustainable Sites Credit, Site Improvement

Plan?

A.

Soils

B.

Hydrology

C.

Vegetation

D.

Maintenance equipment

Full Access
Question # 32

The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is

A.

correlated to an increase of the floor area by at least 5%

B.

determined based upon flush-out procedure requirements

C.

determined by the project team as there is no minimum requirement

D.

correlated to alterations that include construction activity by more than one trade