An administrator is configuring an All Flash cluster to support the following workloads:
• Full clone virtual desktops
• Hadoop
• Write heavy databases
Which three correct configuration options should the administrator use to meet the item requirements? (Choose three.)
For each procedure, indicate whether it is a correct or incorrect procedure that must be configured to meet the item requirements using the drop-down option.
An administrator recently added VLAN 205 CRM in Prism Element. The workloads attached to the associated NICs are unable to establish network connectivity.
Which Layer 2 protocol allows the administrator to troubleshoot this issue from Prism Element?
A consultant needs to review a customer’s switch port configuration to identify any issues. Other customer requirements are as follows:
* Leverage LACP
* Native VLAN will not be used
* Use Multiple Upstream switches
* Use VLANs 20-25 and 30
* LACP Fallback has been Enabled
* vPC or MLAG has been configured
What must be included in a configuration in order to meet these requirements?
Over the period of 2 to 3 weeks, a cluster displays the following:
•Periods where Warning Alerts of memory usage over 75% are asserted
•Periods where Critical Warnings of memory usage over 90% are asserted
•Periods of slow of frozen VDI desktops have caused work stoppage or slowdown
•VDI clones have periodically not powered up when called, causing work stoppage
Which steps should be used to prioritize the administrator’s troubleshooting efforts?
An administrator is migrating 5MB shares from a third-party platform to Nutanix Files with the following characteristics:
• Shares contain user profile directories
• DFS-N will be used
How should the administrator create target shares for this migration?
A customer wants to run SAP HANA on a Nutanix cluster with the following characteristics:
• AHV nodes
• SAP HANA version 2
• Production database files
Which configuration should be recommended to the customer?
An administrator needs to migrate workloads from a Nutanix cluster running VMware ESXi to Nutanix AHV. The migration process needs to be completed in multiple VM groups and support roll back in case any problems are found during user acceptance testing.
Which action should the administrator perform?
After finishing customer education during a new cluster deployment, the consultant wants to make sure all in-scope tasks have been completed.
Which document can the consultant use to verify all tasks have been closed out?