New Year Special Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: scxmas70

NCS-Core Exam Dumps - Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8)

Go to page:
Question # 49

A customer racks all nodes in the new cluster. The customer does not allow IPv6 for node discovery.

The consultant is not allowed to use the consultant’s own flat switch in the customer’s environment.

Which step should the consultant take to resolve this issue?

A.

Bare metal image all nodes with Foundation VM.

B.

Image each node individually with Foundation VM.

C.

Connect to the top of rack switch and discover the nodes with IPv4.

D.

Open a console to all nodes and statically assign IP addresses.

Full Access
Question # 50

The installation process stops before imaging any of the nodes and an error message is displayed notifying the IPMI IP address is unreachable.

What should consultant do to fix the issue?

A.

Ensure the Foundation VM is not in the same broadcast domain as the Controller VMs.

B.

Re-try Foundation using a non-flat switch.

C.

Check the service. log and the individual node log files for more detailed information.

D.

if the nodes are in the same subnet go to the Cluster page and configure multi-homing.

Full Access
Question # 51

An administrator is planning to deploy a Nutanix cluster to support a few high-performance VMs. This deployment will have the following considerations:

• Individual VMs will likely generate network throughputs in the range of 90-100Mbps

• Due to the configuration of the VMs, it is unlikely that a node will host more than one or two of them at a time

• Individual VMs will communicate with only a few (one or two) remote hosts at a time

• Multicast will not be used in the environment

• The hosts are connected via two 1GbE network connections

How should the administrator configure the network bonds to meet this requirement while maintaining the simplest switch configuration?

A.

Configure bond0 as balance-sib

B.

Configure bond0 as active-backup

C.

Configure bond0 as balance-tcp

D.

Configure bond0 as balance-lacp

Full Access
Question # 52

A consultant is planning to use a flat switch for installation.

What is the network requirement for Foundation VM, CVM, Hypervisor, and IPMI

A.

Foundation VM, CVM, and Hypervisor must be on the same subnet. IPMI can be on a different subnet.

B.

CVM, Hypervisor, and IPMI must be on the same subnet. Foundation VM can be on a different subnet.

C.

Foundation VM and CVM must be on the same subnet. Hypervisor and IPMI can be on a different subnet.

D.

Foundation VM, CVM, and IPMI must be on the same subnet. Hypervisor can be on a different subnet.

Full Access
Question # 53

After the successful creation of clusters, the customer wants to ensure that alerts are sent automatically to Nutanix support.

Which Nutanix feature should the consultant ensure is enabled?

A.

Support Portal

B.

Pulse

C.

insights

D.

Support Tunnel

Full Access
Question # 54

Refer to the exhibit.

A Nutanix host is connected as shown in the exhibit with br0-up set to active/backup. Physical Switch 1 experiences a power outage causing br0-up to failover to using eth2. The CVM and host become inaccessible. User VMs restart on other hosts in the cluster, which causes a disruption to those VMs.

Which configuration issue likely caused this outage?

A.

Bridge br0-up should be configured to use balance-tcp rather than active/backup.

B.

The CVM should have eth1 connected to the OVS.

C.

The upstream port for eth2 is missing a VLAN.

D.

The user VMs only have one NIC

Full Access
Question # 55

Refer to the exhibit.

Which IP addresses can be configured for the Foundation VM and Consultant Laptop?

A.

FVM: 10.170.25.15/24, Laptop: 10.170.25.16/24

B.

FVM: 10.170.1.2/20, Laptop: 10.170.1.12/20

C.

FVM: 10.170.16.15/20,: 10.170.16.16/20

D.

FVM: 10.170.25.2/24, Laptop: 10.170.25.12/24

Full Access
Question # 56

A consultant is discussing VLAN tagging for a newly deployed Nutanix system. The customer requests that the the vlan dor the CVMs

and AHV hosts be placed in the customer's management VLAN 10. The customer also has VLAN 20 for production VM traffic and

VLAN 30 for backup/replication traffic.

Which VLAN should the consultant recommend for CVM and host traffic?

A.

VLAN 10

B.

VLAN 0

C.

VLAN 20

D.

VLAN 20

E.

VLAN 30

Full Access
Go to page: