A new testing tool has been selected for an organisation and a pilot project has successfully completed. The next step is to deploy the tool within the organization.
What is a key success factor in tool deployment?
A live defect has been found where a code component fails to release memory after it has finished using it.
Which of the following tools would have been the MOST effective at detecting this defect prior to live implementation?
Which of the following would be a good test technique to use when under severe time pressure?
A garden irrigation system allows the user to specify 2 inputs:
1. Frequency - The number of times the system should be automatically switched on per day; minimum once per day, maximum 5 times
2. Duration - The duration of operation, in whole minutes, each time it is switched on; ranging from 1 to 60
Applying 2-value boundary value analysis which of the following options has the correct test set of valid and invalid boundary values?
Debugging and Testing are key activities in the software development lifecycle.
Which of the following are 'Debugging' activities?
a) Identifying, a failure
b) Locating the cause of failure
c) Fixing the defect
d) Checking the fix has resolved the failure
The following Test Cases have been created for a simple web-based airline booking system.
Test Case 1: Search for an item Available Flights
Test Case 2: View selected item in My Flights
Test Case 3: Login to the system: Login is accepted
Test Case 4: Select an available flight: item added to My Flights
Test Case 5: Print confirmation receipt, then exit
Test Case 6: In My Flights, confirm details and book flight
Which of the following is the correct logical order for the test cases?
In the above State Table, which of the following represents an invalid transition?