Question # 25

A program is developing a next-gene ration product line, and one component has been delivered. However, due to a change request, expectations for another component are unmet

What activity should the program manager perform next?

A.

Program delivery management

B.

Resource Interdependency management

C.

Program performance monitoring and controlling

D.

Benefits sustainment and program transition

Full Access
Question # 26

Which of the following is TRUE about convenience receptacles?

A.

They are duplex or quad receptacles mounted on perimeter walls.

B.

They must be powered by emergency power to prevent loss of service.

C.

They shall be connected to occupancy sensors to ensure user safety.

D.

They increase the count of outlets needed on the equipment racks.

E.

They are those into which equipment, such as switches, shall be plugged

Full Access
Question # 27

Which of the following is a method that an ICT distribution designer would use for clash detection with other disciplines?

A.

Statistical Quantitative Analysis

B.

Interference Fit Verification

C.

ICT pathway design

D.

Building Information Modeling Coordination

Full Access
Question # 28

The above performance report shows the earned value (EV) analysis for a program The program director performs a high-level analysis and must present a summary narrative to the steering committee

What do the current findings show?

A.

Project C is running behind schedule and is over budget, projects A, B and D are on schedule

B.

Project A is running ahead of schedule and is under budget projects B, C and D are behind schedule

C.

The overall program is performing within an acceptable level of variance

D.

Project A is running behind schedule and is over budget projects B, C. and D are on schedule

Full Access
Question # 29

Where would an ICT distribution designer working for a company responding to a RFP expect to find requirements concerning alternative dispute resolution in the scope of work (SOW)?

A.

It would be expected in the portion of the scope of work (SOW) containing technical considerations.

B.

It would not be expected in the scope of work (SOW).

C.

It would be expected in the section of the scope of work (SOW) containing legal requirements.

D.

It would be expected in the part of the scope of work (SOW) delineating acceptance requirements.

Full Access
Question # 30

The program manager wants to increase the team's commitment to the program objectives. The program manager should do which of the following?

A.

Work with the sponsor lo identify the organization's best practices

B.

Work with the program stakeholders and program management office to identify the organization's best practices

C.

Work with the program management office to identify the organization's best practices

D.

Work with the sponsor, program stakeholders, and the program management office to identify the organization's best practices

Full Access
Question # 31

The project managers for component projects A and B schedule the same resource to perform tasks during the same timeframe, resulting in an over-allocation. The program manager reviews the program resource management plan determine that project. A can wait until the resource becomes available, and assigns the resource to project B.

This is an example of which of the following?

A.

Program resource management planning

B.

Program risk mitigation

C.

Resource interdependency management

D.

Project resource planning

Full Access
Question # 32

When considering pathway types, the ICT distribution designer should consider the applicable MICE factors as defined in TIA 568 for structured cabling systems and components MICE 3 relates to

A.

commercial environment

B.

heavy industrial environment

C.

medical environment

D.

light industrial environment

Full Access