A project team seeking certification for a new school is attempting to achieve Materials and Resources Credit, Construction and Demolition Waste Management, Option 2. Reduction of Total Waste Material. What strategy can be taken to meet the requirements of this credit?
A newly constructed school has installed solar thermal systems and wind turbines on site. To achieve the maximum number of Energy and Atmosphere points, which team members must be included?
A LEED Building Design and Construction: Schools project pursuing Location and Transportation Credit, Green Vehicles elects to follow Option 2. Green Buses or School-Owned Vehicles. What action must the project take to meet the Option 2 requirements?
Which of the following buildings meets the Minimum Program Requirements for LEED certification?
What is a viable strategy for optimizing open space under Sustainable Sites Credit, Open Space? U
Several Materials and Resources credits give a bonus location valuation factor, which allows products extracted,
manufactured and produced within 100 mi. (161 km) of the project to take double valuation in credit calculations. The
intent of this bonus is
How can a building owner promote both energy efficiency and thermal comfort in a building?