Under the Building Design and Construction rating systems, projects can opt for a review process that helps teams determine if the project is on track to achieve LEED certification at its preferred level. This process is referred to as
In Sustainable Sites Credit, Light Pollution Reduction, which factor is included in the lamp lumen uplight calculation?
A LEED AP is evaluating whether Indoor Environmental Quality Credit, Acoustic Performance is feasible for a LEED
AP Building Design and Construction: Healthcare project. Which of the following groups of documents would best inform this decision?
A building owner in an arid climate is trying to design an outdoor lunch area for the tenants. Which landscaping strategy is important to employ in order to reduce water demand?
The Required Breathing Zone Outdoor Airflow Vbz for a new banking facility is 0.120 CFM/ft2 (0.6 L/s/m2). If the team decides to attempt Increased Ventilation under Option 2 in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, what is the minimum Design Zone Outdoor Airflow?
What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?
A new commercial building is being designed to use small capacity air handling units. To meet the requirements of the Carbon Dioxide Monitoring strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Environmental
Quality Strategies, where would CO2 monitors need to be located?